Day 6 2016 Route and Stats
April 29, 2016
46.2 miles 4:25 ride time. Ave. 10.4 mph Max 33.4 down 2382 ft, up 4764. Started at 3051 ft. and finished at 5100 ft. elevation, peaking at 6100 ft. Finished at 60 F, started at 57 F.
From Sierra Vista Motel, Congress to Prescott via AZ-89 N.
5 hr 31 min (45 mi)
1. Head northeast on AZ-71 N toward Chittenden St
2. Turn left onto AZ-89 N
3. Turn left onto Copper Basin Rd
4. Turn right onto Park Ave
5. Turn left onto W Gurley St
6. Turn right onto Josephine St
7. Turn right onto Linwood Ave
8. Turn left onto Gail Gardner Way
9. Turn left onto Paar Dr
10. Arrive at location: 1416 Paar Dr
To see this route visit https://goo.gl/maps/
Leave a Reply